top of page
WhatsApp Image 2021-02-23 at 11.41

WhatsApp Image 2021-02-23 at 11.41

WhatsApp Image 2021-02-23 at 11.41

WhatsApp Image 2021-02-23 at 11.41

WhatsApp Image 2021-02-23 at 11.41

WhatsApp Image 2021-02-23 at 11.41

WhatsApp Image 2021-02-23 at 11.41

WhatsApp Image 2021-02-23 at 11.41

WhatsApp Image 2021-02-23 at 11.41

WhatsApp Image 2021-02-23 at 11.41

WhatsApp Image 2021-02-23 at 11.41

WhatsApp Image 2021-02-23 at 11.41

ECC

ECC

Pic

Pic

MK 3

MK 3

Elliot Turbine Module

Elliot Turbine Module

Gear Box

Gear Box

Gear Box

Gear Box

Governor

Governor

Turbine Module

Turbine Module

Governor

Governor

Turbine Module

Turbine Module

Alternator

Alternator

Turbine Module

Turbine Module

Turbine Module

Turbine Module

Turbine Module

Turbine Module

BACK PRESSURE TURBINE BASED

These steam turbines are mainly designed based on the process industries needs. It is custom built and is replacement to the existing Pressure reducing stations (PRS) and Pressure reducing and de-superheating stations (PRDS), which are widely used in the process industries. The basic objectives are to utilize the heat energy available in the steam rather than wasting by throttling it in PRV or PRDS.

Elliot Turbine at the Test Rig - Kirloskar Ebara

COGENERATION PLANTS

Elliot Turbine at the Test Rig - Kirloskar Ebara
bottom of page